Building energy-saving thermal series
1、standard of execution
13754-2008 <test methods thermal output of heating radiators>
2、Equipment composition
1)Install the closed compartment of the radiator under test
2)Circulation air interlayer outside the six walls of the cubicle
3)Equipment for cooling circulating air inside the sandwich
4)Thermal medium circulation system for the tested radiator
5)Instruments and equipment for testing and control
3、Main technical parameters
1)Measurement accuracy of thermal media parameters: flow ± 0.5% temperature ±0.1℃.
2)Net size of small interior: 4×4 m floor height: 2.8 m.
3) Air temperature in a closed room
the reference point on the central vertical axis of the internal space, 0.75 m above the ground, accurate to ±0.1℃;
From the ground 0.05, 0.50, 1.50 m from the roof 0.05 m four points, accurate to ±0.2℃;
On each straight line 1.0m from the two adjacent walls, the two points (8 points in total) 0.75 and 1.50m above the ground are accurate to ±0.2℃.
4)Closed room surface temperature
1.center points of the six inner surfaces, accurate to ±0.2℃;
2.install the vertical centerline of the inner surface of the wall of the tested radiator, 0.30 m away from the ground, accurate to ±0.2℃.
5、 Atmospheric pressure, accurate to ± 0.1kpa.
6、Minimum space required for equipment: length 7× width 6× height 5m.
7、 Power supply: three-phase wireless AC380V 55kW.
8、 Water supply: the room shall be equipped with water and water.
9、Product features
1)The unique thermal medium circulation system ensures the stability of radiator inlet pressure and the accuracy of temperature.
2)All heating water tanks are double-layer thermal insulation structure and lined with stainless steel plate, which means the thermal insulation has good anti-rust performance.
3)The whole piping system adopts seamless stainless steel pipe, which has high resistance to high temperature and high pressure, and good rust resistance.
4)PT1000 temperature sensor is adopted as the temperature measuring element, with basic error less than ±0.1℃, high accuracy and good stability.
5)The measurement and control software is adopted by senior testers with Windows 95/98/2k /XP platform and VB/VC hybrid programming to control the whole detection process with a convenient and flexible human-machine dialogue interface. The report and original record are processed by Microsoft Word, and users can modify and make their own format. The report format of the national construction engineering quality supervision and inspection center is attached to the software for users' reference.
6) The advanced data collection and processing system can automatically analyze and process the test results, and issue the test report and original records.
7)Open Accessa database management, with strong compatibility, can be seamlessly connected with any management software interface.
8)The equipment has automatic protection functions of overcurrent, overpressure, phase and break, and runs stably and reliably.